Jinling Steel frees up your time and resources in order that you can begin your other works simultaneously and efficiently. We will keep ourselves updated with you about the project and every detail is in line with your requirement.

STEP ONE -- EXPLORATION

We need to build up a mutual understanding of our future work together. There are some basic information and details we need to acquire from you, such as your project’s application and needs, timetable, required service and expectation.
 


STEP TWO -- QUOTING

After we have a general idea of your requirement, we can go on to the quoting phase. The dimensional print will be needed for quoting. The dimensional print could be something as simple as a sketch on a napkin with dimensions indicated, to a full-scale CAD file. The material (type and thickness) and desired quantities also an important part to consider.

At this stage, we welcome you to specific changes, updates or variations according to your project needs. Or we can provide different schemes or suggestions to meet your target. After confirming the scheme, we can make a small sample for you to test.


Required for Quote:
> Dimensions
> Material Type & Thickness
> Quantities
> Contact info

You Will Get:
> Initial Offer


> Preliminary Scheme 

Preliminary Scheme:





Product Rendering:





Product Application Simulation:





Small Sample (if needed):





STEP THREE -- ORDERING

After your approval, we move to the order status.
If possible, please supply a solid model or DXF file for your quote. We can create one if you don’t have. If you need, before mass production, we can make a full-size sample for you to confirm.





Accepted File Types:

> Solid models (CAD files)
> DXF




STEP FOUR -- PRODUCTION

Once you confirm the drawing and the order has been created, we can then move your project into production where we begin fabrication.



STEP FIVE -- INSPECTION

When the production completed, we inspect each small part of the system. The balustrade fittings are under 100% inspection.



INSTALLATION TESTING
For the staircase system, we will test the installation after the inspection.





STEP SIX -- PACKING & LOADING


Before startingļ¼Œorder processing